Work Process Of Dar Salma Prefab
- Design and Planning:
- This stage involves understanding the client’s needs and requirements.
- Detailed designs are created, often using CAD software, to ensure accuracy and efficiency.
- Planning includes material selection, manufacturing schedules, and on-site logistics.
- Manufacturing:
- Components of the building, such as walls, floors, and roofs, are manufactured in a controlled factory environment.
- This process allows for greater precision and quality control compared to traditional on-site construction.
- Materials like steel, concrete, and other prefabricated elements are used.
- Transportation:
- The manufactured components are transported to the construction site.
- Logistics play a crucial role in ensuring timely and safe delivery.
- On-Site Assembly:
- The prefabricated components are assembled on-site, following the design plans.
- This process is typically faster than traditional construction, reducing on-site labor and time.
- Foundations are prepared, and the modular units are placed and secured.
- Finishing and Installation:
- Final touches, such as interior and exterior finishes, electrical and plumbing installations, are completed.
- Quality checks are conducted to ensure the building meets standards.