Work Process Of Dar Salma Prefab

  • Design and Planning:
    • This stage involves understanding the client’s needs and requirements.
    • Detailed designs are created, often using CAD software, to ensure accuracy and efficiency.  
    • Planning includes material selection, manufacturing schedules, and on-site logistics.
  • Manufacturing:
    • Components of the building, such as walls, floors, and roofs, are manufactured in a controlled factory environment.  
    • This process allows for greater precision and quality control compared to traditional on-site construction.  
    • Materials like steel, concrete, and other prefabricated elements are used.
  • Transportation:
    • The manufactured components are transported to the construction site.  
    • Logistics play a crucial role in ensuring timely and safe delivery.  
  • On-Site Assembly:
    • The prefabricated components are assembled on-site, following the design plans.
    • This process is typically faster than traditional construction, reducing on-site labor and time.  
    • Foundations are prepared, and the modular units are placed and secured.  
  • Finishing and Installation:
    • Final touches, such as interior and exterior finishes, electrical and plumbing installations, are completed.  
    • Quality checks are conducted to ensure the building meets standards.